ASE389P.7 - The Global Positioning System - Spring 2002 & Summer 2004

Homework and Project Assignments

 

Summer 2004 Projects:  these projects were prepared by the students in this class during Summer 2004 as Independent Research.  Each project represents about 5 weeks of work and was concluded with a 20 minute presentation to the class for a grade.

 

2002 Homework Assignments:  these homework assignments were posted in Spring 2002

 

Term Projects:  these projects were prepared by the students in this class during 2002 as Independent Research.  Each project represents about 5 weeks of work and was concluded with a 20 minute presentation to the class for a grade.
 


 


Maintained by E. Glenn Lightsey (lightsey@csr.utexas.edu).
Last modified on 07/05/04.